VOLVO

CATERPILLAR

Home > Products > CATERPILLAR

  • Diesel engine valve for Caterpillar C13

Diesel engine valve for Caterpillar C13

Large construction machinery, Crane, Mining/Petroleum power


Products Description

Special Characteristics


For valve blank, Using shot blasting process after quenched-tempered, not only eliminates surface stress, but also improve fatigue resistance.


Technical parameter:


ModelDescriptionPart numberMaterialSize(㎜)SurfaceCharacteristicApplicationPower-kwGuarantee
d ΦL
C13INTAKE224302821-4N+4Cr9Si244.560°9.5188.3chromingstrengthen

Large construction 

machinery,Crane,

Mining/Petroleum 

power

287~388100 000 km or 1 year
EXHAUST 224303021-4N+4Cr9Si241.445°9.5187.4chromingvalve seat welding


Engine valve is the executive part of engine timing control of internal combustion engine, and it is the important parts which guarantee power performance, economic performance, reliability and durability of engine.


Our Products Strength:
1. High quality special valve bar material: 4Cr9Si2, 4Cr10Si2Mo, 21-4N, X60, X80, INCONEL751,21-4NWNb.
2. Strict control process: CNC processing line, network continuous furnace for heat treatment,welding of double matels, valve seat welding(STELI), U type quenching, chrome plating and soft nitriding on valve surface, 100% flaw detection for finish products.
3. Quality certificate: ISO9001, IATF16949
4. Fast delivery capability: for batch order, within 30 days
5. Perfect service system: professional engineer for solving variours problem in use.


Quality Certificate

3306

3306


Manufacturing Process

3306



Export Market

Germany, America, Poland, Nigeria and Southeast Asia


Automechanika Dubai 2019

3306

Automechanika Johannesburg 2019

3306


FAQ:

Q1. What is your terms of packing?

A: Generally, we pack our goods in neutral brown boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?

A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?

A: FOB, CIF, C&F, etc.

Q4. How about your delivery time?

A: Generally, if we have stocks, then 5 work days and it will take 35 work days for producing after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?

A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?

A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery.

Q8: How do you make our business long-term and good relationship?

A:1. We keep good quality and competitive price to ensure our customers benefit;

2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.